TECHNICAL SUPPORT

Our technical knowledge on use of the information below is
the result of extensive research and long experience :
Please contact us for an optimal resolution of the problem.

installation
installation instructions

INSTALLATION INSTRUCTIONS FOR SERIES BS, FV, FG, FS 99/..., ESF

Profile has to be laid on fresh epoxy or PCC mortar.
The enticement layer has to be realized in order to respect the alignment between profile and finished floor superior line.
After this first step profile’s wings have to be fixed through supplied screws.
It is very important to verify that profile is straight and perfectly levelled so that its superior corner can be at the same level of tiles or floor in general.
Fixing has to be done in parallel on both profile’s sides each 30 cm.
Profile will work in the right way only if both wings are weel-fixed to the substrate.
Connection of production length profile is obtained by staggering the joints in the individual aluminium profile.
Insertion of central rubber part can be helped using some water added with soap.

 

The central insert has to be installed starting from one end and a roller can help during this phase.
Don’t use a hammer as it could damage

the profile.
Before central rubber insertion, it is very important to check brackets’ runners are free from dirt.

 

INSTALLATION INSTRUCTIONS FOR SERIES FK AND FT

With these profiles’ series please follow above installation instructions.
Profiles will be supplied with to different rubber inserts (one provisional already installed to keep bars at the right distance

and one FT... with upstand 5 mm or FK... with upstand 3 mm) separately.
Covering (tiles, carpet, etc...) have slightly to surmount profile corners.
Then provisional insert can be removed,

covering’s corner can be cut exactly using profiles’ corner as runner and final insert can be installed.

 

INSTALLATION INSTRUCTIONS FOR SERIES FP ..., ES 60/..., FS 146, FS 285/...

Profile has to be laid on fresh epoxy or PCC mortar.
The enticement layer has to be realized in order to respect the alignment between profile and finished floor superior line.
After this first step profile’s wings have to be fixed with anchor (chemical or MMS screws) in case of dynamic load.
It is very important to verify that the profile is straight and perfectly levelled so that

its superior corner can be at the same level of tiles or floor in general.
Fixing has to be done in parallel on both profile’s sides each 30 cm.Profile will work in the right way only if both wings are weel-fixed to the substrate.
Connection of production length profile is obtained by staggering the joints in the individual aluminium profile.
Insertion of central rubber part can be

helped using some water added with soap.
The central insert has to be installed starting from one end and a roller can help during this phase.
Don’t use a hammer as it could damage the profile.
Before central rubber insertion, it is very important to check brackets’ runners are free from dirt.

 


Examples of some shapes achievable with the profiles of series FP.